AI assistant
SANTOS LIMITED — Capital/Financing Update 2007
Oct 7, 2007
65872_rns_2007-10-07_975476bf-9703-4120-9227-2065ae1a8f86.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [73 x 55] intentionally omitted <==
MAGELLAN PETROLEUM CORPORATION
ARBN 117 452 454
ADMINISTRATIVE OFFICE Hartford Square North 10 Columbus Blvd – 10th Floor HARTFORD CT 06106, USA AUSTRALIAN OFFICE 10th Floor, 145 Eagle Street BRISBANE QLD 4000 (GPO Box 2766, Brisbane Q 4001)
TELEPHONE (+1) 860 293 2006 FACSIMILE (+1) 860 293 2349 WEBSITE www.magpet.com TELEPHONE (+61) 7 3224 1600 FACSIMILE (+61) 7 3832 6411 WEBSITE www.magpet.com.au
8 October 2007
ANNOUNCEMENT TO ASX
Drilling Report – Burundi 1 Spuds PL 33 – Cooper Basin QLD
Magellan Petroleum Corporation (NASDAQ: MPET; ASX: MGN) advises that the Burundi 1 near field exploration well spudded in PL 33 in the Cooper Basin of southwest Queensland on 4 October. Burundi 1 is the first of a two well drilling program planned for the Nockatunga area in October. The Maxwell 5 appraisal well in PL 50 will follow.
Burundi 1 is located approximately 7.5 kilometres south of the Nockatunga oil facility and 9.5 kilometres southwest of the Thungo oil field. The Burundi prospect is a 4-way dip closed structure located on the western end of the Karwin Complex, immediately updip of the Karwin Trough.
The primary oil reservoir objectives in Burundi 1 are the Murta Formation and the Birkhead Formation. The Burundi 1 well which is being operated by Santos is programmed to have a total depth of approximately 1436 metres RT.
Burundi 1 Details:
| Petroleum Title: | PL 33, Queensland |
|---|---|
| Location: | approximately 7.5 km S of the Nockatunga oil facility and 9.5 km |
| southwest of the Thungo oil field | |
| Coordinates: | Latitude: 27° 46' 49.24" South |
| Longitude: 142° 30' 28.62" East (GDA 94) | |
| Drilling Rig: | PDI 721 |
| Proposed Total Depth: | 1436 metres RT |
| Objectives: | Primary oil – the Murta Formation and the Birkhead Formation |
| Operations: | Burundi 1 spudded on 4 October |
Participants in Burundi 1 are:
Magellan Petroleum Corporation 38.994% Santos Limited (ASX:STO)(Operator) 61.006%
Page 2
Magellan Drilling Report
Forward Looking Statements
Statements in this release which are not historical in nature are intended to be, and are hereby identified as, forward-looking statements for purposes of the United States Private Securities Litigation Reform Act of 1995. These statements about Magellan may relate to its business and prospects, revenues, expenses, operating cash flows, and other matters that involve a number of uncertainties that may cause actual results to differ materially from expectations. Among these risks and uncertainties are the extent of the recoverable reserves at those properties and the risk that any wells drilled may fail to encounter hydrocarbons in commercially recoverable quantities. Any forward-looking information provided in this release should be considered with these factors in mind. Magellan assumes no obligation to update any forward-looking statements contained in this release, whether as a result of new information, future events or otherwise.
For further information, please contact Dr Gwynn Davies, General Manager, Magellan Petroleum Australia Limited on telephone (07) 3224 1600.
Page 3
Magellan Drilling Report
==> picture [440 x 662] intentionally omitted <==